Back
to top

Transportation Engineering Projects

MDOT | M-231 Over the Grand River

The 7-mile route connects M-45 (Lake Michigan Drive) in Robinson Township to M-104/I-96 in Crockery Township, providing a much-needed additional crossing of the Grand River. The bridge is 3,709-ft long, making it the sixth-longest bridge in the state of Mi
graphic arrow

City of Grand Rapids | Blue Bridge

The existing pedestrian bridge spanning the Grand River in downtown Grand Rapids needed rehabilitation to continue serving as a popular tourist destination during Art Prize and a scenic location for wedding ceremonies and photographs.
graphic arrow

MDOT | M-5 Bridge

The Fishbeck team provided full construction of two non-motorized pedestrian bridges allowing for safe connectivity to local recreational trails on either side of M-5.
graphic arrow

MDOT | M-6

Fishbeck performed design and survey services for inlay rehabilitation of 3.2 miles of M-6. Designed as an Alternate Bid for both concrete and HMA pavement.
graphic arrow

City of Ann Arbor | Forest Avenue and Transformer Park

The full reconstruction of Forest Avenue, bound between Hill Street and South University in downtown Ann Arbor, involved numerous Fishbeck engineering disciplines
graphic arrow

City of Allen Park | Enterprise Drive

Fishbeck provided full construction engineering services for this MDOT local agency project.
graphic arrow

City of Dexter | Baker Road Roundabout

Fishbeck completed work on the City of Dexter’s Baker Road Roundabout in collaboration with the Washtenaw County Road Commission.
graphic arrow

CONTACT US