Back
to top

Transportation Engineering Projects

City of Grand Rapids | Blue Bridge

The existing pedestrian bridge spanning the Grand River in downtown Grand Rapids needed rehabilitation to continue serving as a popular tourist destination during Art Prize and a scenic location for wedding ceremonies and photographs.
graphic arrow

City of Ann Arbor | Forest Avenue and Transformer Park

The full reconstruction of Forest Avenue, bound between Hill Street and South University in downtown Ann Arbor, involved numerous Fishbeck engineering disciplines
graphic arrow

MDOT | M-59

This project involved full reconstruction of one of the most highly traveled and well-known roadways in Macomb County, with an extremely high density of consumer-based businesses.
graphic arrow

City of Grand Rapids | Seward Ave. Bikeway

From 2013 to 2015, Fishbeck assisted the City of Grand Rapids with grant applications, preliminary/final design, and construction of 3.5 miles of multi-use pathway on the west side of the Grand River.
graphic arrow

City of Lincoln Park | Michigan Hazel Avenue over Sexton-Kilfoil Drain Bridge

Fishbeck designed the reconstruction of a single-span structure carrying Hazel Avenue over Sexton-Kilfoil Drain in the City of Lincoln Park.
graphic arrow

WMU | Roundabout

Fishbeck designed a solution providing safer, more efficient traffic movement and a fresh, clean, and aesthetically pleasing entrance to Western Michigan University.
graphic arrow

CONTACT US