Back
to top

Civil Engineering Projects

City of Grand Rapids | Blue Bridge

The existing pedestrian bridge spanning the Grand River in downtown Grand Rapids needed rehabilitation to continue serving as a popular tourist destination during Art Prize and a scenic location for wedding ceremonies and photographs.
graphic arrow

City of Ann Arbor | Forest Avenue and Transformer Park

The full reconstruction of Forest Avenue, bound between Hill Street and South University in downtown Ann Arbor, involved numerous Fishbeck engineering disciplines
graphic arrow

Holland BPW | Water Reclamation Facility

The Holland BPW identified the need to upgrade the plant to handle increased organic loading and solids generated by the primary and secondary treatment processes and improve odor abatement.
graphic arrow

MDOT | MLK Boulevard over M-10, Design/Build Project

To accommodate an increase in traffic, the M-10/M-5 interchange was modified and updated. Examining the condition of the existing bridge led to bridge replacement, and extension and widening of the ramp lane north of the MLK Boulevard Bridge.
graphic arrow

MDOT | M-5 Bridge

The Fishbeck team provided full construction of two non-motorized pedestrian bridges allowing for safe connectivity to local recreational trails on either side of M-5.
graphic arrow

CONTACT US