Fishbeck designed a solution providing safer, more efficient traffic movement and a fresh, clean, and aesthetically pleasing entrance to Western Michigan University.
Fishbeck was retained by the Oakland County Water Resources Commissioner to employ nontraditional streambank protection measures to create a stable and natural looking channel that would significantly reduce
Fishbeck performed design and survey services for inlay rehabilitation of 3.2 miles of M-6. Designed as an Alternate Bid for both concrete and HMA pavement.
The West Michigan Horticultural Society began planning for this facility with the intent of providing the West Michigan area with a multi-use horticultural center.
Tremendous growth of GVSU’s nursing and health professions programs called for an expansion of the existing Cook DeVos Center for Health Sciences building located in the “Medical Mile” of downtown Grand Rapids.
The City of St. Joseph constructed a Lake Michigan intake and shorewell pumping station to provide additional capacity and reliability to the raw water supply, which serves over 38,000 residents in six communities.
The Fishbeck survey department assisted Hardman Construction with their need to produce a 3D as-built of an earth retention system (ERS) installed on the north lawn area of the Michigan State Capitol Building in Lansing.