Environmental Investigation/Remediation Projects

Reynolds Consumer Products | Reynolds Red Bluff Landfill | Red Bluff, California

Fishbeck has provided consulting and design services for the Reynolds’ Red Bluff facility for nearly 20 years.
Related Categories:
graphic arrow

Ottawa Lake Terminal, LLC | Ottawa Lake Terminal UST Removal

Fishbeck provided contractor oversight for the removal of five underground storage tanks (USTs) and conducted site assessment sampling for a project in Ottawa Lake, Michigan.
Related Categories:
graphic arrow

Confidential Client | Midway Site Hydrogeologic Study | Kalamazoo, Michigan

Fishbeck conducted a hydrogeologic study to evaluate potential impacts to groundwater, surface water, and nearby wetlands.
Related Categories:
graphic arrow

Michigan State University | Campus Water System Improvements

Fishbeck conducted hydrogeological studies for the Type I water supply wells, which included test borings, aquifer testing, water quality evaluations, large quantity withdrawal evaluations, and permitting.
Related Categories:
graphic arrow

City of Coldwater, Michigan | Underground Storage Tank Removal

Fishbeck was contracted to register and remove a UST during foundation work.
Related Categories:
graphic arrow

Military Equipment Manufacturing Facility Environmental Services

Fishbeck implements investigative and remedial activities at a legacy site.
Related Categories:
graphic arrow

Gratiot Area Water Authority | Well No. 12 Installation

Fishbeck assessed the geological and hydrogeological setting and aquifer production at Well No. 12.
Related Categories:
graphic arrow

Successful Removal Action at Missouri CERCLA Site

Fishbeck was selected to design and implement a removal action strategy for a former manufacturing area of a Superfund Site in Missouri.
Related Categories:
graphic arrow