The full reconstruction of Forest Avenue, bound between Hill Street and South University in downtown Ann Arbor, involved numerous Fishbeck engineering disciplines. Project challenges included tight design and construction schedules, a heavily-traveled corridor including vehicular and pedestrian trips, existing drainage problems, and limited ROW that generated grading issues.
Fishbeck provided design and survey for full-depth road construction, water main, ADA ramp upgrades, and drainage improvements. Fishbeck also performed a thorough traffic engineering review of the pedestrian and vehicular volumes, routes, and operations; creating robust maintaining traffic plans that facilitated and maintained access for all travel methods.
We collect information to enhance your web experience. We do not collect any personal identifying data. To opt out, please click the ‘Decline’ button.