Back
to top
graphic arrow

Holland BPW | Water Reclamation Facility

Holland BPW | Water Reclamation Facility

The Holland BPW identified the need to upgrade the plant to handle increased organic loading and solids generated by the primary and secondary treatment processes and improve odor abatement. Fishbeck was retained by the Holland BPW to develop a plan and design the systems needed to improve the WRRF’s efficiency and effectiveness.

Following the project’s conceptual planning to optimize WRRF operation, Holland BPW retained Fishbeck to help make the plan a reality through design and construction administration without constructing new buildings or tanks.

CONTACT US