The Frances Park Pump Station sits adjacent to the Grand River and is a cast-in-place structure with a dual-chamber wet well and five existing pumps: three wet weather pumps and two dry weather pumps. The station discharges to the upstream end of the west side interceptor through a 24-inch-diameter force main.
Keeping the existing pump station in operation throughout construction was challenging. A phased construction approach was required where portions of the existing electrical equipment were disconnected and removed to accommodate new equipment installation.
A new bypass pumping manhole was installed to allow temporary bypass of flow during completion of the wet well and electrical equipment improvements.
We collect information to enhance your web experience. We do not collect any personal identifying data. To opt out, please click the ‘Decline’ button.